Dispatch Time Definitions: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 13: | Line 13: | ||
|| || Plant Wash || Loaded || ARTPLANT.PLANT_WASH_MINLD || min/ld || PLANT_WASH_MINLD: SMALLINT<BR>|| | || || Plant Wash || Loaded || ARTPLANT.PLANT_WASH_MINLD || min/ld || PLANT_WASH_MINLD: SMALLINT<BR>|| | ||
|- | |- | ||
|| Leave Plant || || || || || DepartDT in Loads Table | || Leave Plant || || || || || || DepartDT in Loads Table | ||
|- | |- | ||
|| || Travel Time || To Job || ARTZONETIME.TO_ZONE_MINLD || min/ld || TO_JOB_MINLD: SMALLINT<BR> | || || Travel Time || To Job || ARTZONETIME.TO_ZONE_MINLD || min/ld || TO_JOB_MINLD: SMALLINT<BR> | ||
|- | |- | ||
|| Arrive Job || || || || || || | || Arrive Job || || || || || ||ScheduleDT. This is the anchor for Time Calculations | ||
|- | |- | ||
|| || Waiting Time || Arrive || ARTPLANT.JOB_SETUP_MINLD<BR>ARTTRCLS.JOB_SETUP_MINLD || min/ld || JOB_SETUP_MINLD: SMALLINT<BR> | || || Waiting Time || Arrive || ARTPLANT.JOB_SETUP_MINLD<BR>ARTTRCLS.JOB_SETUP_MINLD || min/ld || JOB_SETUP_MINLD: SMALLINT<BR> | ||
Revision as of 17:53, 7 September 2023
Time Status and Interval For Disptatch
| Status Time | Interval | Dispatch Status | Default Source | Calc Method | Order Hd Field | Comment |
| Ticket Time | ||||||
| Batch Time | Ticketed | ARTPLANT.BATCH_SETUP_MINLD ARTPLANT.BATCH_LOAD_SECYD |
min/ld+sec/yd | BATCH_SETUP_MINLD: SMALLINT BATCH_LOAD_SECYD: SMALLINT |
BATCH_SETUP_MINYD + ((BATCH_LOAD_SECYD * {Load Size}) * 60) | |
| Loaded Time | ||||||
| Plant Wash | Loaded | ARTPLANT.PLANT_WASH_MINLD | min/ld | PLANT_WASH_MINLD: SMALLINT |
||
| Leave Plant | DepartDT in Loads Table | |||||
| Travel Time | To Job | ARTZONETIME.TO_ZONE_MINLD | min/ld | TO_JOB_MINLD: SMALLINT | ||
| Arrive Job | ScheduleDT. This is the anchor for Time Calculations | |||||
| Waiting Time | Arrive | ARTPLANT.JOB_SETUP_MINLD ARTTRCLS.JOB_SETUP_MINLD |
min/ld | JOB_SETUP_MINLD: SMALLINT | ||
| Begin Pour | ||||||
| Pour | Pour | DITUSECL.UNLOAD_RATE_SECYD ARTTRCLS.UNLOAD_RATE_SECYD |
sec/yd | UNLOAD_RATE_SECYD SMALLINT/ INTERVAL (spacing) MINLD |
ARTORDHD.UNLOAD_RATE_SECYD should be Greater of (DITUSECL or ARTRCLS rate) --- All Resulting Time Calculations based on lesser of ARTORDHD.UNLOAD_RATE_SECYD*QTY or ARTORDHD.INTERVAL (spacing) | |
| End Pour | ||||||
| Job Wash | Wash | ARTPLANT.JOB_WASH_MINLD | min/ld | JOB_WASH_MINLD: SMALLINT | ||
| Leave Job | ||||||
| Travel Time | Return | ARTZONETIME.TO_ZONE_MINLD | min/ld | FROM_JOB_MINLD: SMALLINT | ||
| Arrive Plant | ReturnDT in Loads Table | |||||
| In Yard |
Time Definitions
- Target
- Times based on the load schedule time
- Projected
- Target times adjusted for the load offest (Target Return Offset). The offset is to be adjusted at each status change in the shipping process.
- Actual
- Actual times recorded